David Miller

@davidmiller01209

Author

  • Joined January 2026
David Miller @davidmiller01209 ·

The Two Pieces of Kit That Make or Break a Worksite

A site supervisor I know lost half a day on a fit-out job because the boom lift ran out of battery mid-platform and the only generator on site wasn't compatible with the charging system. Not a major equipment failure. N…

David Miller @davidmiller01209 ·

When Compressed Air and Power Go Wrong on Site

Most sites treat compressed air and power generation as solved problems — set up at the start of the job, then forgotten until something fails. That failure usually arrives at the worst possible time. Mid-pour, mid-shif…