IBM I Consulting Services Should Start a 7.6 Upgrade With What Disappears
Most IBM i upgrade projects start in a familiar way. The team checks whether current hardware supports the target release, gets a quote for new Power systems if needed, confirms software vendor support, schedules a weekend, and books the install. Testing focuses on whether core applications start and run. For many releases, that approach has worked well enough.
IBM i 7.6 deserves a different starting point. Alongside new features such as native multi-factor authentication, it removes support for a long list of older functions and products. Some are development tools that programmers have used for decades. Others are networking services, printing and fax capabilities, or management utilities that quietly support business processes nobody has looked at in years.
When these tools disappear, the impact rarely shows up as a failed application startup. It shows up when a developer cannot maintain a display file the usual way, when invoices stop faxing, or when devices on the network cannot get addresses. IBM i consulting services should begin every 7.6 upgrade plan with an inventory of what disappears and what depends on it.
What IBM i 7.6 Removes
IBM's 7.6 upgrade planning page lists features and products that are not supported on IBM i 7.6, along with suggested replacements. Highlights include:
Development tools
-Screen Design Aid, Report Layout Utility, File Compare and Merge Utility, Advanced Printer Function, Character Generator Utility, and Data File Utility, with Rational Developer for i, Code for i, or other tools suggested as replacements
-Business Graphics Utility
Networking services
-BOOTP server and the native DHCP server, with the ISC Kea DHCP server suggested as a replacement-DNS Server, RADIUS, RouteD (replaced by OMPROUTED), QoS Server, VPN IKEv1 and IPComp, Bisync, PPP, and L2TPBusiness and system functions
-FAX/400, with third-party fax products suggested as replacements
-CICS Transaction Server for i, with migration to native IBM i options suggested
-GDDM, Performance Graphics and Performance Advisor, OptiConnect, Management Central, and Universal Manageability Enablement
-XML Toolkit for i, IBM Technology for Java 11 64-bit, and the non-expiring Backup, Recovery and Media Services license
IBM also notes that organizations moving from 7.4 to 7.6 should review features removed in 7.5.
IT Jungle's coverage of the removals highlighted FAX/400 and CICS for i in particular, since both still support business processes in some shops.
Why These Removals Hide in Plain Sight
Many of these tools are so familiar that nobody lists them as dependencies.
Development habits. Programmers who maintain display and printer files often use Screen Design Aid and Report Layout Utility through PDM and SEU. If those tools are gone after the upgrade, maintenance work stalls until developers move to new tools, which may require training, licensing, and changes to source management.
Business documents. FAX/400 may still send purchase orders, invoices, or confirmations to customers or suppliers who rely on fax. When it stops, the failure may not be noticed until a customer complains.
Network services. A BOOTP or DHCP server on IBM i may assign addresses to printers, terminals, or devices on a warehouse floor. If it disappears, devices may fail to connect after their next restart.
Legacy transactions. CICS applications migrated from mainframes years ago may still run critical functions. Rewriting them takes time.
Operations tools. Management Central, Performance Graphics, and Performance Advisor may be part of routine monitoring or reporting that someone checks weekly.
Why an IBM i Consultant Starts With the Inventory
An experienced IBM i consultant knows that the riskiest items are rarely the ones on the hardware checklist. A 7.6 upgrade plan should start with a structured inventory:
1.Check installed products and options. List licensed programs and options on each partition, and compare them with IBM's removal list.
2.Scan for usage, not just installation. Use job logs, history logs, object usage information, and the audit journal to see which tools and services are actually used and how often.
3.Interview developers and operators. Ask which tools they use daily and weekly, including utilities they consider too obvious to mention.
4.Trace business workflows. Identify processes that rely on fax, network services, CICS transactions, or graphics output, and confirm who owns them.
5.Check vendor software. Ask software vendors whether their products depend on any removed functions.
6.Map each dependency to a replacement. For each tool or service in use, record the replacement, the effort to adopt it, and the owner.
The inventory often reveals that only a handful of removed items matter. Those few, however, can determine the upgrade timeline. Rank them by business impact and lead time: a fax replacement that involves suppliers may take months, while switching a developer to a new editor takes weeks. Start the longest items first, and set a go or no-go checkpoint a month before the upgrade to confirm each replacement is live and tested.
Replacing What Goes Away
Each removal has its own replacement path:
-SDA, RLU, and other development utilities: move developers to Rational Developer for i, Code for i in Visual Studio Code, or other modern editors. This is often a good moment to adopt Git-based source control as well.
-FAX/400: replace with a third-party fax product or move documents to email, portals, or EDI where trading partners allow.
-BOOTP and DHCP: move address assignment to the ISC Kea DHCP server or the network's existing DHCP infrastructure.
-DNS and RADIUS: use external DNS servers and existing identity infrastructure.
-CICS: plan migration to native IBM i programs, APIs, or other approaches, which may be a project in its own right.
-Management Central and performance tools: move to Navigator for i and current monitoring tools.
Some replacements can be completed weeks before the upgrade. Others, such as CICS migration, may need to finish first or require postponing the upgrade for affected partitions.
A Representative Upgrade
Consider a manufacturer on IBM i 7.4 planning to move to 7.6 on new Power hardware. The original plan covers hardware delivery, a save and restore to the new system, and a weekend cutover.
An IBM i consultant begins instead with an inventory. It finds that three developers maintain display files with SDA every week, that FAX/400 still sends about 200 purchase orders a month to smaller suppliers, that the IBM i DHCP server assigns addresses to 40 handheld scanners in the warehouse, and that a 7.5 removal affects an older reporting tool. No CICS or Management Central usage turns up.
The plan changes. Developers move to Code for i and receive training two months before the upgrade. Purchasing works with suppliers to move most purchase orders to email and adopts a fax service for the rest. Network staff configure address reservations for the scanners on the corporate DHCP servers and test them. The reporting tool is replaced. The upgrade weekend proceeds as planned, and on Monday the warehouse scanners connect normally.
When to Delay a Partition
Not every partition should move on the same schedule. If a partition runs CICS applications that cannot be migrated in time, or depends on a vendor product not yet certified on 7.6, it may be sensible to upgrade other partitions first and leave that one on its current release while the work completes. IBM's support lifecycle for the current release sets the outer limit. A phased approach keeps the program moving without forcing a risky change on the most complex workloads.
Make any delay a deliberate decision with a date and an owner. Record the reason, the work required to remove the blocker, and the target upgrade window, and review progress monthly.
Documentation After the Upgrade
Every upgrade changes how people work. Developers use new editors, operators use new monitoring tools, and business users may receive documents through new channels. Update runbooks, developer guides, and process documentation as part of the project, not afterward. Record which removed functions were replaced and how, so the next upgrade starts from an accurate picture. This documentation is often the most lasting value of a careful upgrade.
What to Expect From IBM i Consulting Services
Strong IBM i consulting services for a 7.6 upgrade deliver:
-a removal inventory specific to each partition, based on usage evidence-a dependency map linking each removed item to business processes and owners-a replacement plan with effort, cost, and timing-updated hardware and software compatibility checks, including vendor confirmations-a test plan that covers the replaced functions, not just core applications-a cutover plan with rollback optionsIBM AS400 services that begin with hardware and install dates may still succeed, but they carry more risk of surprises after go-live.
Choosing an IBM AS400 Consulting Company
When selecting an IBM AS400 consulting company or individual IBM AS400 consultant for an upgrade, ask:
How will you find which removed functions are actually used on the client's partitions?
-Can you show a sample removal inventory from a past 7.5 or 7.6 upgrade?
-How do you handle developer tool transitions, including training?
-What is your approach for CICS, fax, and network service replacements?
-How do you test functions that changed, as well as core applications?
Consultants with experience in recent upgrades will answer from practice.
Security Gains Worth Planning For
Upgrading to 7.6 also adds capabilities. It brings native multi-factor authentication and other security improvements, though MFA requires the system to meet higher security and password levels. Combining the removal inventory with a security hardening plan makes the upgrade more valuable and avoids a second disruptive project later.
Conclusion
IBM i 7.6 removes several older development tools, networking services, fax capabilities, CICS, and management utilities that organizations may still rely on. Since these dependencies are not always documented, they can cause unexpected problems during an upgrade. IBM i consulting services should begin with an inventory of the discontinued functions, the business processes that depend on them, and suitable replacements. Addressing these dependencies early helps teams plan the upgrade with fewer surprises and avoid disruption after the transition.
0 comments
Log in to leave a comment.
Be the first to comment.